Site survey were carried out in two stages.
During the first stage, engineering, hydrographic and geophysical survey were carried out on a 3x3 km area.
The first stage of the survey included the following type of work:
• Navigational plotting from the port of Bautino to the location of the exploration well;
• bottom sounding;
• sonar survey of bottom;
• magnetometry;
• seismoacoustic profiling;
• HF CDPM.
Within the framework of the second stage, the following type of engineering and geotechnical work were performed:
• soil sampling;
• drilling of geotechnical wells;
• drilling a pilot well;
• SPT.